Jump menu

Main content |  back to top

Key facts

Category: Integrated LNG
Interests: Shell 27.5%, Gazprom 50%, Mitsui 12.5%, Mitsubishi 10%
LNG capacity: >10mln tonnes of LNG and 47 mln barrels of oil
Fields: Piltun-Astokhskoye (PA) oil field, Lunskoye gas field
Key contractors: CTSD (LNG plant), Starstroy (onshore pipelines), AMEC (marine facilities)

Sakhalin-2 is a project of many firsts: The offshore oil platform Molikpaq was the first to be installed on the Russian shelf. The Lunskoye-A and Piltun-Astokhkoye-B (PA-B) platforms are also the first of their type to be installed on the shelf.,The LNG plant is the first in Russia.

Now that Sakhalin-2 has reached its full capacity, it takes 5% of the world’s current liquefied natural gas (LNG) market. Japan and South Korea are the main customers for oil and LNG exports.

Markets

Virtually all the gas from Sakhalin-2 has now been sold under long-term contracts to customers in the Asia-Pacific region and North America. There is potential to expand the project through the Area of Mutual Interest signed with Gazprom in April 2007, which provides opportunities for growth, including the purchase of third party gas by Sakhalin Energy and potential acquisition of exploration blocks in the area. It enhances the prospects for Sakhalin-2 to become a regional oil and LNG hub.

Project development

Shell workers at Sakhalin

The first year-round oil export from the new Oil Export Terminal at Aniva Bay took place in December 2008. The LNG plant was officially inaugurated on 18 February 2009 and the first LNG cargo started its journey to Japan in March 2009. Overall construction work for the project was completed in 2009.

More than 25,000 people worked at the project at the peak of its construction.

Sakhalin-2 lays the foundation for Russia to become a leading energy exporter to the highly competitive energy markets of the Asia-Pacific region.

Technology

Sakhalin-2 is technically challenging. It is equivalent in size to five world-scale projects, located in a hostile sub-arctic environment, and covers a vast area in a region with almost no existing infrastructure. There are also environmental, ecological and social sensitivities to be tackled. The float-over installation of the topsides for the PA-B platform set a world record at some 28,000 tonnes. The previous record was held by the Lunskoye-A platform at 22,000 tonnes.

Two 800-kilometre pipelines, which bring oil and gas from the fields in the north of the island to the ice-free export terminal in the south, traverse mountainous terrain in an earthquake zone and cross more than 1,000 watercourses, many of which are ecologically sensitive.

Environment and society

Western Gray Whale

The Sakhalin-2 project has set new standards in social and environmental performance and transparency in Russia. In 2005 the project accepted the recommendations of the Independent Scientific Review Panel (set up under the International Union for Conservation of Nature) and re-routed the offshore pipelines to avoid whale-feeding areas. In 2006, in co-operation with IUCN, the Western Gray Whales Advisory Panel was established to provide advice to minimise risks from oil and gas developments for the habitat of the whales.

The project has also brought substantial benefits to local communities through social investment, which covers safety, education, health care, arts and culture, infrastructure development, indigenous minorities, biodiversity and environmental protection.

Related press releases